Waste Treatment Centre for Solid Radioactive Waste at Leningrad Nuclear Power Plant

Contract

The contract includes design, manufacturing, testing, supply, installation supervision, commissioning and personnel training related to solid waste treatment centre at the Leningrad NPP.

Description

The Leningrad NPP constructed a building for the waste treatment centre and made available the necessary infrastructure and auxiliary systems. Solid radioactive waste is delivered to the WTC by trucks. WTC technical data: Incinerator throughput: 50kg/h of solid waste Compactor throughput: six to eight 200l drums/h with compacting force of 20,000kN. The final product loaded in concrete containers is consigned for interim storage. NUKEM was responsible for all aspects of the projects. This included project management, design, planning and supply of equipment and systems, documentation, safety analysis reports, procurement, installation and commissioning.

Services

NUKEM provided the following services: Basic and detail design of the processing facilities Procurement and delivery of equipment and documentation Supervision of installation and commissioning Development of PSAR Licensing support Personnel training (in Germany and on site) Project management
Questions? We are here for you.

Fast, personal and competent - get in touch with us.

We use cookies

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.