Pilot Decommissioning Project at Metsamor Nuclear Power Plant

Contract

A NUKEM-led consortium consisting of NUKEM, EWN and WorleyParsons was awarded a contract for the development of a dismantling concept for the Metsamor Nuclear Power Plant and the implementation of a pilot project for the dismantling of two subsystems of NPP unit 1.

Description

Both reactor units of the Metsamor NPP were shut down shortly after a massive earthquake in 1988. Reactor unit 2 was then restarted in 1995. The project seeks to develop a detailed decommissioning concept for the Metsamor NPP and put the proposed approach to the test in practical terms for two subsystems of NPP unit 1.

Services

The first phase of the project is dedicated to the development of a systematic approach to the decommissioning of the entire NPP to make sure that all necessary licenses, planning activities, tools and processes have been identified and properly finalized before the physical work can start. The second phase of the project was based on the outcomes of the first phase. During the second phase of the project, a pilot decontamination and decommissioning project was launched in a low-risk area. Based on the testing results, work was continued to further refine and optimise the processes with regard to safety aspects. The decontamination and decommissioning techniques used at the Metsamor NPP will also facilitate the implementation of future decontamination and decommissioning projects in a safe and efficient manner despite constantly increasing complexity and risks.
Questions? We are here for you.

Fast, personal and competent - get in touch with us.

We use cookies

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.